BS 7671 Cable Retention System

Engineering

Led a cross-functional engineering project developing a three-stage BS 7671-compliant cable retention methodology, forecasting a 70%+ reduction in safety-critical cable failures through awareness, training, and a Poka-Yoke designed-out solution using Autodesk Inventor.

Completed
12 months
BS 7671
Autodesk Inventor
Poka-Yoke
Safety Engineering
CAPEX
Stakeholder Management
BS 7671 Cable Retention System

Overview

Led a cross-functional engineering project developing a BS 7671-compliant cable retention solution for a high-volume manufacturing environment, forecasting a reduction in safety-critical cable failures of over 70%. The methodology was structured across three stages: a targeted awareness campaign to surface the failure mode across the production and quality teams; a formal training programme embedding correct cable handling and retention standards; and a Poka-Yoke-informed designed-out solution using Autodesk Inventor to eliminate the failure mode by design. Managed CAPEX planning, design documentation, and stakeholder engagement across production, procurement, and quality. Methodology fully developed and implementation initiated before project was placed on hold.

Tasks

  • Root Cause Analysis
    Completed

    Identify root causes of safety-critical cable failures through data review and cross-functional investigation.

  • Stage 1: Awareness Campaign
    Completed

    Develop and deploy targeted awareness communications to surface the failure mode across production and quality teams.

  • Stage 2: Training Programme
    Completed

    Design and deliver a formal training programme embedding BS 7671-compliant cable handling and retention standards.

  • Stage 3: Poka-Yoke Designed-Out Solution
    Completed

    Engineer a Poka-Yoke retention system in Autodesk Inventor that eliminates the failure mode by design, removing reliance on correct technique.

  • CAPEX Planning & Documentation
    Completed

    Complete CAPEX business case, engineering documentation, and stakeholder sign-off across production, procurement, and quality.

Details

Status:
Completed
Duration: 12 months
Categories:
Engineering
Technologies:
BS 7671
Autodesk Inventor
Poka-Yoke
Safety Engineering
CAPEX
Stakeholder Management

Related Projects

Industry 4.0 Automated Machinery Programme - PLC & HMI Engineering
Completed

Industry 4.0 Automated Machinery Programme - PLC & HMI Engineering

Python & C++ Industrial Automation & Data Acquisition
Completed

Python & C++ Industrial Automation & Data Acquisition

ECO / PDM / PLM System Implementation
Completed

ECO / PDM / PLM System Implementation